This is a close up of the Steam Plant after construction in 1924.
Photo taken during construction in August 1924. Notice the stack and building are not finished yet.
Pipe line from Steam Plant to Physical Education Building from a point just east of the Physical Education Building looking toward Hinshaw Dorm and two other dormitories.
Eight inch pipe to new dormitories opposite Kirland Hall.
(Now runs to Quad Dorm from Plaza Fountain.)
Picture showing construction of heat line from Steam Plant on Walker Ave. to new dormitories at the Quad. Pipe ran under bridge on Walker Ave.

 

 

Page updated: 29-Jun-2007

Accessibility Policy

Web Design
Gail Peeples
(336) 334-3456
dgpeeple@uncg.edu
Facilities Operations
The University of North Carolina at Greensboro
800 Oakland Ave.
Greensboro, NC 27402-6170
VOICE 336.334.5684
FAX 336.334.4026